Magna Park South S278 Works, WP3, Foul Rising Main & Pump Station
Project details
Construction of new roundabout, private roads and 3km foul rising main & pump station.
Client / Contractor
VolkerFitzpatrick Ltd
Programme
52 weeks
Location
Magna Park, Lutterworth
January 2020 – January 2021
Period
Subcontract
NEC Option A lump sum
Scope of Works
S278 Works;
- Earthworks – 9000m3 cut & 17000m3 engineered fill excavated from a borrow pit
- Drainage – 1200m
- Ducting – 6000m
- Kerbs & edgings – 3000m
- Culvert extension – Stream over pumping diversion, culvert units lifted in with crane on night shift road closures
- Grasscrete
WP3;
- Ducting & utilities – 6700m
- Kerbs & edgings – 6000m
Foul rising main & pump station;
- Earthworks to pump station – 4500m3
- Foul rising main civils works including service crossings – 3000m
- 5m deep foul manhole, connection onto existing live foul, in the road, over 24hr working weekend possession
- 5m deep foul manhole connection at pump station
- 600mm dia. 5m deep foul drainage at pump station
- 3.6m dia. 5m deep wet well chamber
- 2m dia. weholite pipe tanks